About

hybrid power tree

Power Output

The Hybrid Power Tree is a robust energy solution, generating between 10,000 and 18,500 kWh (kilowatt hours) annually. Its integrated wind turbine effectively harnesses varying wind speeds. Each Hybrid Power Tree is specifically designed with the 14-year weather patterns for your location, with 12 to 24 months of specific wind data showing you just how the Hybrid Power Tree would have performed over the last year or two.

See The Hybrid Power Trees Wind Map

Panel Design

The Hybrid Power Tree revolutionizes renewable energy with its innovative design, distinctly free from traditional rooftop installations. Unlike conventional solar systems that require expansive roof space or land, the Hybrid Power Tree integrates solar panels within its tree-like structure, eliminating the need for cumbersome roof panels. This design enhances aesthetic appeal by blending seamlessly into various environments and expands the possibilities for renewable energy deployment in urban, suburban, and rural settings where roof space may be limited or unavailable. By combining solar and wind technologies into a compact and visually appealing form, the Hybrid Power Tree offers a versatile solution that maximizes energy production without compromising on efficiency or space utilization.

Easy to Install

The installation process for the Hybrid Power Tree is designed to be straightforward and efficient, reflecting its innovative approach to renewable energy integration. Unlike traditional solar panel installations that require mounting on rooftops or extensive land areas, the Hybrid Power Tree can be installed in various environments with minimal disruption.

  • The Process

    1. Site Assessment: Initially, a thorough site assessment is conducted to determine the optimal location for the Hybrid Power Tree. Factors such as sun exposure, wind patterns, and space availability are carefully evaluated to maximize energy production.


    2. Foundation and Setup: The installation typically begins with preparing the foundation. Depending on the specific model and design, this may involve anchoring the base securely to the ground. The structure of the Hybrid Power Tree is designed to be stable and resilient, capable of withstanding various weather conditions.


    3. Assembly of Components: Once the foundation is ready, the components of the Hybrid Power Tree are assembled on-site. This includes erecting the support structure, positioning the solar panels, and integrating the wind turbine system. The design allows for modular assembly, facilitating efficient installation and ensuring all components are securely connected.


    4. Connection and Testing: After assembly, the electrical connections are made to link the solar panels, wind turbine, and any storage systems (if included) to the power distribution network or to a storage battery system. Thorough testing is conducted to ensure all components are functioning optimally and safely.


    5. Commissioning and Handover: Upon successful testing and verification of performance, the Hybrid Power Tree is commissioned for operation. Installation technicians provide guidance on maintenance and operation to the customer, ensuring they understand how to monitor energy production and manage the system effectively.


    6. Post-Installation Support: Post-installation support and service agreements may be offered to maintain the Hybrid Power Tree's performance over its operational lifetime. This may include periodic inspections, cleaning of solar panels, and adjustments to optimize energy production based on seasonal changes and local weather patterns.

Financing Options

We offer national financing options through our partnership with Skeps Financial, making it easy for you to finance your Hybrid Power Tree installation. With our QR Code system, simply scan, answer a few questions, and discover the financing offers you qualify for instantly. It's a straightforward and personalized way to get started with sustainable energy solutions tailored to your needs.

Compare U.S. Energy Prices See Options

The Benefits

Warranties

Each Hybrid Power Tree comes with a 30-year manufacturer warranty, ensuring peace of mind and reliable performance over its operational lifespan.

1 “In-state” Move

The system can be relocated within the same state if needed, providing flexibility for changing circumstances or relocation plans.

1st Bill Paid

Some packages come with a unique first bill to get people started.